See what 16 real asphalt roof quotes left out, and what to ask for.
Tick what your quote mentions. Your count shows here.
Your quote mentions
the work
clean-up and permit
money and dates
Copied. Paste it into a message to your roofer.A short message asking for the missing items in writing.A short message asking for the missing items in writing.
A roof quote should include the roof's size, the work and materials, the price, the payment terms and the dates. We read 16 real asphalt quotes that homeowners filed with city boards. Not one said how big the roof was, and 9 never mentioned a right to cancel.
What 16 real quotes included
Item
Included
Priced extra
Not mentioned
Unclear
Tear-off
16
0
0
0
Decking repair
4
7
5
0
Underlayment
16
0
0
0
Ice and water shield
14
0
2
0
Drip edge
14
0
1
1
Starter strip
10
0
6
0
Hip and ridge cap
14
0
2
0
Flashing at chimneys and walls
9
0
7
0
Pipe boots
13
0
3
0
Ventilation
15
0
1
0
Valleys
11
0
5
0
Disposal
13
0
2
1
Permit
7
3
5
1
Cleanup or magnet sweep
12
0
3
1
Workmanship warranty length
10
0
3
3
Deposit or payment terms
9
0
5
2
How long the price holds
5
0
8
3
Right to cancel
6
0
9
1
Change orders and hidden damage
11
0
5
0
Start or finish date
0
0
16
0
Roof size
0
0
16
0
Source: 16 asphalt roof quotes filed with city boards in Detroit, Wichita, Medina and Amsterdam, 2022 to 2026. Each read twice, separately, on . Unclear means the quote is unclear or says two things.
No size, no way to check the price
None of the 16 quotes stated the roof's size, in squares or square feet. Without the size, you can't divide the price by the roof or compare it with a price guide or another quote. A square is 100 square feet of roof.
Measure it from the ground: your house length, width and pitch give the roof's area in the roofing calculator. Then ask each roofer to write their figure on the quote. If two roofers measure the same roof differently, ask why.
Decking is the blank check
Decking is the layer of boards under the shingles, and rotten boards only show once the old roof is off. 7 of the 16 quotes priced decking separately, per sheet or per foot. 5 didn't mention decking at all, and 4 included it in the price.
Ask what one sheet costs and how many are included.
Detroit homeowner's quote, dated , filed with the Detroit Historic District Commission
Replacement OSB $100/per 4ft x 8ft first 5 Sheets are Free If full decking replacement required additional - $7,050
A price per sheet and a free allowance, in writing. This is what to ask for.
Detroit homeowner's quote, dated , filed with the Detroit Historic District Commission
Deteriorated roof sheathing is not included in the price. $42.00 per sheet 7/16" OSB, $70.00 per sheet for 1/2" CDX plywood
Extra, but priced. You can work out the worst case.
Your right to cancel is missing from 9 of 16
9 of the 16 quotes didn't mention a right to cancel, and 8 didn't say how long the price holds. The FTC's Cooling-Off Rule lets you cancel many sales of $25 or more made at your home. You have until midnight of the third business day.
The rule skips some sales, like a buyer-started emergency with a written waiver; if it covers yours, the seller must tell you when you sign. Some states give you more rights. Get both in writing before you sign anything.
Lifetime or five years? One quote said both.
2 of the 16 quotes gave two different workmanship warranty lengths, and a third was unclear. One promised a limited lifetime warranty in its scope and five years in its terms. Another said 10 years in its scope and one year in its terms.
Ask which length the roofer will put in writing.
Wichita homeowner's quote, dated , filed with the Delano Design Review Committee
Scope: "limited lifetime workmanship warranty for as long as you own the home" Terms: "free from defects in workmanship for five (5) years from the date of completion"
Two lengths. Ask which one the roofer will sign.
Detroit homeowner's quote, dated , filed with the Detroit Historic District Commission
Scope: "Includes a 10-year labor warranty" Terms: "one-year limited warranty to repair any defects in workmanship"
Ten years or one. Get one answer on one page.
16 quotes, read twice
We read 16 asphalt roof quotes filed with city boards in Detroit, Wichita, Medina and Amsterdam, from 2022 to 2026. Each quote was read twice, separately, and the two reads agreed on 96% of the items. Where they differed, we went back to the quote.
Homeowners filed these because their houses sit in historic or design-review districts. These are 16 quotes, not every quote in America.
Common questions
Should I get multiple quotes for roof replacement?
Yes, but you can only compare quotes that list the same items. Tick each quote against the 21 items above, and ask every roofer for the roof's size in squares.
Is $30,000 too much for a roof?
A 2,000 square foot roof of architectural asphalt shingles usually costs about $8,000 to $16,000 installed; tile or slate cost more. Divide your quote by your roof's area in the roof replacement cost calculator to see where it falls.
Can I cancel a roofing contract after 3 days?
Not under the FTC's Cooling-Off Rule: the window ends at midnight of the third business day; Saturdays count but Sundays and federal holidays do not. After that, check your contract and your state's law, which can give you more rights.
Can a roofer waive my deductible?
In some states it's against the law: Texas bans roofers from waiving or paying it, and Minnesota bans promising to pay any part of it. Ask your state's insurance department before you agree to it.
How long is a roofing quote good for?
Only 5 of the 16 quotes we read said how long the price holds: four gave 30 days and one gave 14. Ask for the date in writing before you compare quotes.
Is your quote's price right for your roof?
Check it free against your roof's size and sourced prices, and see what it leaves out.
We read 16 asphalt roof quotes that homeowners filed with city boards, each twice and separately, and settled every difference by going back to the quote. Quotes are named by city, board and month only: no names, addresses or documents. Laws are quoted from their own pages.
A sample of 16 quotes from historic and design-review districts, not every quote in America.
Unclear means the quote is unclear or says two different things.